The $2.5 million is a shared pool, not an allocation for each community. Eligible applicants are county or municipal governments, or state- or federally recognized tribes, located in the 20 counties covered by the Coastal Area Management Act. This is not a household repair-grant application. Applicants need completed RCCP planning and community-engagement work, or an equivalent process, and an identified priority project.
For local governments, the first decision is whether the project needs design work or is ready for construction. Phase 3 can fund engineering, design and related work to advance a nature-based resilience project; its anticipated awards are roughly $25,000 to $750,000. Phase 4 anticipates roughly $50,000 to $750,000 for implementation. Neither range is a formal maximum, but the state warns that larger requests will be harder to accommodate. No required cash or in-kind match applies.
A construction application needs more than a place on a planning list. The Phase 4 guidance requires earlier planning and design work or its equivalent, a maintenance and monitoring plan, and a site-control form. It also calls for records showing that the appropriate governing body has approved or been made aware of the project. Applicants without present site control must explain how they will obtain it; completed projects require permanent conservation protection.
The current FAQ gives more specific instructions on governing-board action than the Phase 4 RFA. It calls for a resolution or meeting minutes documenting approval of the application at a properly advertised public meeting; the RFA also describes records that establish the board's awareness of the proposal. For applicants whose boards cannot act before the deadline, the FAQ says to contact DCM in advance. Applicants should clarify the documentation with program staff instead of assuming that acknowledgement alone meets the application instructions.
Use the separate Phase 3 or Phase 4 application materials linked from the official notice, and rank the projects if sending more than one proposal. The RFA documents direct completed submissions to rccp@deq.nc.gov by November 10 at 5 p.m. Confirm the timezone with program staff rather than assuming it. The program overview contains an extra dot in one rendering of that email address; the address above follows both RFA documents. Awards are not permission to start immediately: DEQ requires a contract signed by both parties before work begins.
Additional official sources: 2026–2027 Phase 3 RFA guidance · 2026–2027 Phase 4 RFA guidance · 2026–2027 Phase 3 and 4 FAQ · Current RCCP overview and application materials